29/12/2007
- A number of bits I had not done were required on elevators
Dimple
holes in Left & Right elevator skins that required the pneumatic
squeezer to get in as the other holes were done by the DRDT-2.
Drill
& dimple 3 holes which will attach fibreglass nearest trailing
edge as I figured that I would not be able to do that once the rib
was in place.
Riveted on the counterbalance skins to both elevators; 2 inboard
rivets top and bottom as per the plans

Smoothed the edges of the elevator skins both left and right
Dimpled & machine Countersunk the bottom and top of the trim tab
spar

Smoothed & Dimpled the trim tab and associated trim cable horn
Prepared trim tab components for priming
Put in
4 universal rivets to hold 2 plate nuts on right hand elevator
spar; that I had not done when I had done the other rivets on the
skeleton.
Dimpled the trim tab access cover plate with #6 dimple dies and
put it away safely for later; after a little test fit of course.